Wire up the AOV to the control panel / building management system (this work MUST be carried out by a suitably qualified person). See wiring diagram, right. NOTE:- AOV MUST BE SECURED TO THE ROOF DECK BEFORE BEING OPERATED. 5. When satisfied with AOV installation and operation; complete the roofing works (roof insulation, felting / membrane etc).